
School Gymnasium Repair Case Study
Problem This High School was refinishing their gymnasium floor and installing new bleachers. Upon removal of the old bleachers it was discovered that the gymnasium floor had settled along the west wall. Raise-Rite Concrete Lifting (HMI’s Contracting Division) was referred to by an outside engineering firm to repair the sunken






