
Highway Ramp Stabilization Case Study
Problem Raise-Rite was brought in to investigate subgrade issues beneath a section of a highway ramp after visible settlement of the highway shoulder was observed near a recently installed underground culvert. The signs of movement in the shoulder raised concerns about the stability of the underlying soils, prompting the need






