
FIREHOUSE CONCRETE SETTLEMENT CASE STUDY
Project Overview Raise-Rite Concrete Lifting was contacted to assess and resolve a floor settlement issue in a historic cathedral. The problem was discovered after a section of the interior floor—approximately 52 linear feet in length—had dropped between ¾ inch and 1½ inches. This shift left noticeable gaps between the floor